Project Summary: Aims to meet the needs of citizens and residents to ensure the smooth flow of traffic and improve road safety. It involved the reconstruction and resurfacing of a number of main and secondary roads within this Block, including Roads 1702, 1723 and 1727, and the upgrading of Rd 1317, along with the construction of car parks on this road. The project also included the construction of a rainwater drainage network to manage water accumulation during the rainy season, as well as the provision of pavements for pedestrians and the implementation of traffic safety measures on these roads.