Project Summary: The project works included the construction and opening of new roads in Janabiyah , Block 575, with varying widths and a total length of approximately 4.570 kilometres, serving approximately 426 residential properties. The project also included earthworks, the laying of sub-base and asphalt layers, and the installation of kerbs for footpaths, as well as the construction of a rainwater drainage network and a sewerage network, as well as the installation of new lighting columns, traffic signs and road markings to ensure the required level of safety for road users, and some landscaping and tree planting along both sides of the roads.