Contractor: Sayed Khadhem Al Durazi & Sons
Summary: The project works include construction and improvement of roads and construction of a main lane for storm water drainage line from Wadi Al-Buhair area to Tubli Bay in the opposite side of Sanad. In addition to the construction of the infrastructure in the area represented by the construction of a storm water drainage network extending 6 km from Wadi Al-Buhair to Sanad, and a micro tunnel intersecting with Al-Istiqlal Highway, in addition to ground preparation and burial works. The total length of the project 7.6 kilometer.