Contractor: UCO ENGINEERING W.L.L.
Summary: The work comprises the construction of the main entrance to Block 111 and Road 1117, 1120. The project includes earth grading, laying of filling layers and asphalt paving. The project also includes the construction of a stormwater drainage network, installation of new lighting poles, installation of traffic signs and painting of land lines. The length of the roads to be constructed is about 4 km.