Summary: The scope of works includes providing sewer connection to 21 properties at AlDair area – Block 231. The works comprises of constructing new 200mm uPVC sewer main pipeline for a total length of 396 m, laying new 150mm lateral sewer line for a total length of 111m, and construction of 32 manholes.