Project Summary: The project includes the construction of a new sewerage network through trench excavation and horizontal drilling to serve 968 properties in Blocks 1016 and 1203, in Al Lawzi and Hamad Town. This will be achieved through the construction of a main sewer line with diameters ranging from 200 mm to 1000 mm and an approximate length of 13 km, in addition to several secondary lines with a diameter of 150 mm and a total length of approximately 10 km.
The project also includes the construction of 436 manholes of Type “F", 288 manholes of Type “H", 5 manholes of Type “J", and 25 manholes of Type “L". The project works further include the construction of a new pumping station with a capacity of 650 liters per second.