MUHARRAQ RING ROAD- PHASE 1

​​​

Cost: BD5,063,238 (Funded by the Saudi Development Fund)

Project summary:

Muharraq Ring Road Project starts from the entrance to Galali and Amwaj and ends at Diyyar Al Muharraq entrance, passing through the entrances to Samaheej and Dair Villages. Work comprises of transforming the road from a single one way road to a double road with 3 lanes on each direction, with the possibility of adding a fourth lane in the future at the part located between the intersections of Galali and Samaheej at a length of 8.4km.

The project will provide a double high capacity road on the Eastern side of the island. Work also includes improving the intersections with Samaheej and Dair, installing safety barriers, lighting poles and traffic signals.

Muharraq Ring Road is strategically essential as it would be used as an alternative to Raya Avenue (former Aradus Avenue); providing access to Galali, Samaheej and Dair. Muharraq Ring Road will also provide an access to investment projects located along the road. Due to the fact that the road has been witnessing increased traffic volumes, the need has arisen to improve the part extending from Amwaj entrance to Diyyar Al Muharraq, also passing through Samaheej and Dair.

Sector : Strategic Area : Muharraq
Project Size : Project Time Frame :
Start Date : End Date :
Project Status : Finished Projects