Cost: BD184,464
Contractor: Abdul Hadi Al Afoo
Summary:
The Project comprises of extending 0.86km long main connections and 0.54km long sub-connections, constructing 88 inspection chambers for both the main and sub connections and connecting 74 houses and lands to the network in Block 1025.